Construction scheduling and project controls, under one baseline.

Scheduling tells you when. Controls tell you what it costs and whether you are on track. S&P delivers both, so progress, cost and manpower all read from the same plan.

Construction Scheduling

4 services · SCH
SCH-01

Baseline Schedule Development

An executable, contract-compliant CPM baseline built with your project and field leadership, and structured so it holds up through review, updates and closeout.

Scope

  • WBS, activity coding and calendars
  • Engineering and submittal logic
  • Procurement and long-lead tracking
  • Testing, commissioning and turnover

Deliverables

  • Primavera P6 XER or MS Project file
  • Basis of schedule narrative
  • Critical path and milestone summary
  • Specification compliance checklist
SCH-02

Schedule Updates & Progress Reporting

A dependable status cycle that captures real progress, holds logic integrity and produces forecasts your owner and leadership will trust.

Scope

  • Weekly or monthly status updates
  • Actual dates, remaining durations and logic revisions
  • Critical and near-critical path analysis
  • Float trend and variance tracking

Deliverables

  • Update narrative and variance report
  • Two- to six-week look-aheads
  • Executive summary dashboard
  • Owner submittal package
SCH-03

Schedule Review & Health Checks

An independent assessment of a schedule that has been rejected, keeps slipping or no longer reflects the job, with prioritized fixes rather than a list of metrics.

Scope

  • DCMA 14-point style quality assessment
  • Logic, constraint and lag diagnostics
  • Critical path validation
  • Contractor schedule review for owners

Deliverables

  • Health check scorecard
  • Prioritized corrective action list
  • Review comment log
  • Walkthrough with the project team
SCH-04

Recovery Planning & Delay Analysis

Practical recovery alternatives when the job is behind, and defensible delay analysis built on the project's own schedule record when time is in dispute.

Scope

  • Recovery and acceleration scenarios
  • Time impact analysis (TIA)
  • Windows and as-planned vs. as-built analysis
  • Fragnet development for change events

Deliverables

  • Recovery schedule and narrative
  • TIA report with supporting fragnets
  • Delay event chronology
  • Claims and REA support documentation
Two construction professionals in hard hats walking a steel structure, one holding a tablet
Controls that start on the job site, not in the spreadsheet.

Project Controls

4 services · PC
PC-01

Cost Control & Forecasting

A cost structure that aligns to the schedule WBS, so budget, commitments and forecasts move with the work instead of lagging a month behind it.

Scope

  • Control budget and cost breakdown structure
  • Commitment and actual cost tracking
  • Estimate at completion (EAC) forecasting
  • Cash flow and spend curves

Deliverables

  • Monthly cost report
  • Forecast vs. budget variance analysis
  • Cash flow projection
  • Contingency drawdown log
PC-02

Progress Measurement & Earned Value

Objective progress based on installed quantities and agreed rules of credit, rolled up into earned value metrics that show true productivity.

Scope

  • Rules of credit and progress methods
  • Quantity tracking by discipline
  • Planned vs. earned vs. actual hours
  • SPI, CPI and productivity factors

Deliverables

  • Progress S-curves
  • Earned value report
  • Discipline productivity dashboard
  • Weekly progress summary
PC-03

Resource & Manpower Forecasting

Resource-loaded schedules that turn the plan into a staffing curve, so craft, equipment and subcontractor demand is visible before it becomes a problem.

Scope

  • Resource loading by craft and discipline
  • Manpower histograms and peak analysis
  • Resource leveling scenarios
  • Equipment and crane planning

Deliverables

  • Manpower curve and histogram
  • Staffing plan by month
  • Peak load risk summary
  • Resource-loaded P6 file
PC-04

Change Management & Reporting

A disciplined change process that captures scope, cost and schedule impact together, plus reporting that gets the right story to the right audience.

Scope

  • Change order and trend logs
  • Schedule and cost impact assessment
  • Risk register and mitigation tracking
  • Owner and executive reporting

Deliverables

  • Change log with impact summaries
  • Monthly project controls report
  • Risk register
  • KPI dashboard

Engagement models

Support sized to the project, not the overhead

Senior scheduling and controls capacity without adding a permanent full-time position. Choose a defined deliverable, ongoing support or embedded staffing.

Fixed scope

Defined Deliverable

A baseline, health check, recovery plan or TIA with a set scope and price.

  • Fixed fee
  • Clear start and finish
  • Ideal for bids and reviews
Monthly

Ongoing Controls Support

Recurring updates, reporting and forecasting on a steady cadence.

  • Monthly retainer
  • Weekly or monthly cycles
  • Remote with site visits
Embedded

Project Team Staffing

A scheduler or controls lead working inside your project team.

  • Hourly or monthly
  • On-site or hybrid
  • Scales with project phase

FAQ

Common questions

Need something not listed here? Ask us directly →

Which scheduling software do you use?

Primarily Oracle Primavera P6, which most owners and specifications require. We also work in Microsoft Project and can convert between formats when needed.

Can you take over a schedule already in progress?

Yes. We start with a health check on the current file, correct the logic and status, then take over the update cycle without losing the project's schedule history.

Do you work for owners or contractors?

Both. We build and update schedules for general and trade contractors, and we review contractor schedules and provide independent controls oversight for owners.

Do you support projects outside Texas?

Yes. Most work is delivered remotely with site visits as needed, so we support projects throughout the United States.

How is pricing structured?

Fixed fee for defined deliverables, a monthly rate for ongoing updates and controls, or hourly for staffing and advisory work. Every proposal lists deliverables and cadence up front.